Consulting services for supervision of works execution for road works - 9.5 km, bridge over Sf. Gheorghe Channel - L=78 m, 2 lanes / traffic direction and hydrotechnical works consisting in arrangement of a pitching quay along the Danube with 400 m length. The services are conducted according to FIDIC Conditions of Contract - Red Book - Edition 1999. Project financed by EIB funds.
2006 - 2009
Romania
Bank protection on Sulina Channel
Consulting services for supervision of execution for hydro technical works for protection of Sulina channel river banks on 35 km length. The first two services components consist of carrying out a topo-hydrographical measurements system and designing a signalling system on Danube river by a GPS - DGPS system. The third project component consists in removal of Rostok shipwreck from Sulina channel riverbed. The services are conducted according to FIDIC Conditions of Contract - Red Book - Edition 1999.
2004 - ongoing
Romania
Border Crossing Between Calarasi (RO) and Silistra (BG)
The consulting services refer to supervision of works execution for 2 lots:: Lot 1: DN 3 Road Rehabilitation Works and Lot 2: – Construction of checkpoint infrastructure. The contract works include: earthworks, strengthening of foundation soil, roads and platforms with rigid pavement in the enclosure of border crossing (5km), concrete pavement structure, civil works for buildings, utilities networks. The consulting services are developed in conformity with FIDIC Conditions of Contract-Red Book-Ed. 1999.
2004 - 2007
Romania
Border crossing checking point between Calafat and Vidin
The design services include elaboration of feasibility study, technical project and detailed design for carrying out the rehabilitation of the mooring ramp and protection dyke, for the arrangement and systematization of the access areas to the border control-checking point, for reconstruction the covering of the disinfection tank, works for increasing traffic fluency, for the rehabilitation of passengers’ berth and for arrangement of pontoon quay for waiting berths.
2003 - 2003
Romania
Bucharest Traffic Control System and Public Transport Management System
EBRD allocated a large financing for Municipality of Bucharest for development and implementation of a Public Transport Management (PTM) system using global positioning technology. This is the first project of this type implemented in Romania. In partnership with WSP, our project proposees an Urban Traffic Control system which provides information on public transport vehicles' location in 100 intersections to a central control room. The services include design and consul;tancy for supervision of works execution.
2004 - 2008
Romania
Extension and modernization of Piatra Neamt infrastructure: water and wastewater systems
Consulting services include the supervision of works execution for the extension, modernization and rehabilitation of water supply and wastewater systems, including wastewater treatment station in Piatra Neamt, funded by ISPA 2002 RO 16 P PE 023-07. The services include also design and verification activities for project development program operating and maintaining water and wastewater infrastructure, master plan, auditing, advertising and promotional activities of the project. Project is developed under FIDIC Conditions of Contract Red Book and Yellow Book - Ed.1999
2009 - ongoing
Romania
Hydropower arrangement of Olt river on Cornetu – Avrig sector
The design services include the elaboration of technical project and detailed design for carrying out works for dyke protection on Olt river right bank on 360 m length, protection works of the railway slope, protection of dyke slope, arrangement of canal on the right bank of Olt river, works for construction a bridge over the canal and for arrangement the access road in the hydropower plant area.
2003 - 2003
Romania
Hydrotechnical works in Oltenita port
Supplying design services which include elaboration of feasibility study, technical project and detailed design for carrying out the rehabilitation works for 778 m of pitching quay, quay endowement with accessories and the arrangement of eigth berths of 75 – 100 m length.
2002 - 2003
Romania
Improvement of Navigation Conditions on Danube between Calarasi and Braila
Design services including elaboration of feasibility study and technical project for improving the navigation conditions on Danube, funded by ISPA. The sectors afferent to this project are: Danube between Calarasi and Braila about 200 km, Batin area and Calafat harbour. Based on analysis of existing hydraulic and morphologic conditions, a mathematical model will be developed. The designed solutions are in compliance with environmental protection requirements.
2004 - 2006
Romania
Improvement of Navigation Conditions on Romanian - Bulgarian Common Sector of the Danube
Design services including elaboration of feasibility study and technical project for improving the navigation conditions on Danube. The sections afferent to this project are: a) Danube between Iron Gate II and Calarasi/Silistra section, of about 500 km, b) Danube between Ceatal Ismail to Ceatal Sfantu Gheorghe section, of about 10 km, c) Danube-Black Sea Canal and Poarta Alba – Midia – Navodari Canal section, of about 100 km, and d) extension of the Calafat port railway device. The project is developed by a Consortium formed by several entities of the Tractebel Engineering group.
2007 - ongoing
Romania
Infrastructure for the containers terminal in Port Oltenita
Design services including preparation of the feasibility study and documentations for approvals needed for realisation of containers terminal infrastructure arrangement in Port Oltenita are provided. The study includes 3 alternatives: Alternative I – Containers operations on the rolling tracks. Alternative II – Mobile crane operations. Alternative III – Operations on the rolling track, on the platform quay.
2005 - 2005
Romania
Master plans for urban transport in Bucuresti, Sibiu, Ploiesti
The project includes consultancy services for the improvement of transport strategy in Bucharest, Sibiu and Ploiesti cities. The existing Master Plan for urban transport in Bucharest is updated, while new Master Plans are proposed for Ploiesti and Sibiu. The Master Plans are followed by strategies for transport infrastructure development, developing strategies for road maintenance program. The project was developed in partnership with W.S.P.(U.K).
2007 - 2008
Romania
Modernization and rehabilitation of the road between DN 5 and DJ 507 and of South bypass for Giurgiu municipality
The scope is the improvement of the regional transport infrastructure in Giurgiu county in order to create a favorable context for economical development of the region. Contract’s specific objectives are: Modernization and rehabilitation of the road between DN 5 Bucharest – Giurgiu & DJ 507 Giurgiu – Oinacu and South bypass of Giurgiu municipality. The project provides reduction of distance between DJ 507 and DN 5 and facilitates the road access to DN 5 on the European corridor IX.
2008 - 2009
Romania
Modernization of transport infrastructure - Orastie bypass
The project includes engineering services (feasibility study and technical project) for construction of bypass Orastie with a total length 11.15 km with cross section motorway type. The project works include road, culverts, 4 bridges, 2 overpasses, crossroads arrangement, strengthening works, hydrotechnical and drainage works.
2000 - 2002
Belarus
Modernization of transport infrastructure: Husi bypass
The project scope consists in design of technical and economical documentation for the Husi bypass realization in order to ensure a traffic speed of 100 km/h. This project was approved by AMPOST in 2008 (Priority axis 2, major intervention domain 2.1. – National Program regarding the modernization and development of the national transport infrastructure) being financed by the European Regional Development Fund (FEDR) and the state budget. The designed works include the construction of 14 km new National Road, 3 bridges, 5 viaducts, 19 culverts, bank protection works and junctions arrangement with other regional and national roads in the area.
2009 - ongoing
Romania
Modernization of transport infrastructure: Medias bypass
The project objective is preliminary design (feasibility study and technical project) for carrying out a bypass for Medias Municipality in order to improve the traffic fluency in the city downtown and its orientation toward DN 14 which makes the link between Sibiu and Sighisoara. The works include construction of 8.5 km of new road, two bridges over the Tarnava River, two railway overpasses, two viaducts along Tarnava River, river bank protection works and arrangement of roundabouts with other county and national roads in the area.
2008 - ongoing
Romania
Modernization of two roads sections in Vaslui, Bihor and Salaj counties (ISPA 2005/RO/16/PA/003/01)
Design services and technical assistance for the rehabilitation / modernization of DN 24 county limit Galaţi / Vaslui up to Crasna - 54 km., DN 24B Crasna - Albiţa - 48 km. and DN 1H Zalau – Alesd - 70 km. are provided. Present project is part of the National Program regarding the modernization and development of the national infrastructure by increasing the safety conditions, traffic speed and transport conditions improvement.
2008 - 2009
Romania
New Infrastucture: Administration Complex for Giurgiu Waterways Administration
Design documentation (FS, TD, Technical Specification and documentation for permits) is provided for the following works categories: New building – Administrative Building; New building – Production, repairing and maintenance workshop for the Danube signalization systems; Connections to utilities: electricity, drinkable water, heating, ventilation – air conditioning systems, telecommunications, low current flows, access control system; green areas, parkings, vertical systematization, exterior lighting; New mooring quay, bank protection; Waste water treatment plant (collection and treatment); water supply networks and sewerage networks.
2007 - 2009
Romania
Penetration of Timişoara Boulevard in Bucharest
Design services include preparation of feasibility studies, permits and geotechnical studies, traffic studies and documentation for permits and approvals obtaining, including those for utilities. The project studies the sector starting at the junction of Timisoara Boulevard, Cascade Valley and West continues to CET West. Timisoara Boulevard is extended with a new route towards bypass, railway crossing, respectively Ciorogarla Southern Railway Station, then connected to the Bucharest bypass at km 54 + 500.
2005 - 2006
Romania
Primary rehabilitation of DN 15 Targu Mures - Satu Nou
The design project comprises the elaboration of feasibility study, documentations for obtaining all approvals / permits, tender documentation and detailed design for road works (39 km length), culverts, drainage works, junction arrangement, ancillary works, strengthening, protection works and arrangement of level crossing.
2004 - 2004
Romania
Primary rehabilitation of DN 23 Focsani - Braila
The design project comprises the elaboration of feasibility study, documentations for obtaining all approvals / permits, tender documentation and detailed design for road works (83 km length), culverts, drainage works, junction arrangements, ancillary works, strengthening and protection works.
2004 - 2004
Romania
Realization of border crossing between Turnu Magurele (Romania) and Nikopol (Bulgaria)
Consultancy services for construction works dedicated to a new border crossing between Turnu Magurele (Romania) and Nikopol (Bulgaria) are provided. Supervision is provided for: banks protection, mooring ramp, access roads, stationing platforms, civil constructions, interior and exterior utility networks (water, sewerage, telecommunications, electrical and thermal networks). Also, certified verification for drawings issued by the Contractor is performed. Project complies with the FIDIC-Red Book Conditions of Contract and was realized with PHARE Funds.
2005 - 2008
Romania
Rehabilitation of Bucharest bypass - North section
The main objective of the project is to increase the traffic fluency on the Bucharest bypass, caused by the present rush traffic. The bypass is extended to 4 traffic lanes. The works include design and technical asistance for execution of following works: 10 km of road, two overpasses at Stefanesti and Tunari - 110 m total length, protection / relocation of utilities networks affected by the execution of works.
2007 - 2008
Romania
Rehabilitation of DJ 411 Călăraşi County limit – Clejani (DN 61)
The project includes the design for 46.26 km of the district road rehabilitation and includes: technical expertise, feasibility study, documentation for obtaining permits and authorizations necessary to complete financing applications (according to the Guidelines for grant funding - Priority 2 - Improve regional and local transport infrastructure), technical specifications, detailed design, tender documents, technical assistance during the execution.
2008 - 2008
Romania
Rehabilitation of DN 3 Ostrov – Băneasa
Design services for the rehabilitation of NR3 for 40 km. are provided. Types of works included in this contract are: rehabilitation and upgrading of the pavement, civil works and protection works, bridges and culverts, junctions with classified roads, signaling and markings. Services refer to feasibility, preparation of documentation for obtaining permits / approvals needed to works implementation.
2008 - 2009
Romania
Rehabilitation of DN 6 including Alexandria and Caracal bypasses
Project includes the rehabilitation of 132 km. of the DN 6 and the construction of Alexandria and Caracal municipalities bypasses, in order to ensure the basic infrastructure required by RNCMNR. This project is developed in collaboration with Inocsa and includes the preparation of the following studies: topographical, geological, traffic, hydrological, hydraulic, and environmental, as well as design activity. The designed works include roads, bridges & culverts, consolidation, banks protection, junctions’ arrangements, railway crossing, parking areas & bus stations, utilities relocation and protection.
2008 - 2009
Romania
Rehabilitation of DN 6, Drobeta Turnu Severin - Lugoj sector
The design project includes services for road rehabilitation works of 143 km of road and construction of three bypasses with a total length of 18 km of new road. The project proposes the widening of the road platform from 8 m to 10 m, with 7 m carriageway and 1.50 m shoulder. The project comprises structure works for 4 overpasses, 33 viaducts and 40 bridges and elaboration of tender documentation according to FIDIC Conditions of Contract - Red Book - Edition 1999 and also providing technical assistance during execution of works.
2001 - 2003
Romania
Rehabilitation of DN 66 Petrosani - Simeria
Supplying services for design and technical assistance during works execution for the rehabilitation of 79 km road, bridge works (41 bridges and over 80 culverts), junctions, railway level crossing, overpasses, drainage works, strengthening, consolidation and protection works. The services include field surveys, structural design, environmental studies, risk management, tender documentation (according to FIDIC Conditions of Contract - Red Book - Edition 1997.)
2000 - 2003
Romania
Rehabilitation of DN 7
The consulting services refer to the supervision of works execution for road rehabilitation on 20 km length, junction arrangement with classified roads, traffic management, utilities relocation (electrical installation, telecommunication installation, water supplying networks), sewerage system, bridge works, culverts, road marking and road signalling, arrangement of sidewalks.
2003 - 2006
Romania
Rehabilitation of DN 79, Arad - Oradea sector and DN 19 Oradea - Satu Mare sector
The project objective is the rehabilitation of DN 79, Arad – Oradea sector with a total length of 112 km. The project is part of the Roads Rehabilitation VI Programme, financed by EIB and Romanian Government. The works include design and supervision of follwing works: 13 bridges, 69 culverts, arrangement of 32 junctions, railway level crossing and utilities relocation. The project solutions are in compliance with the environmental protection requirements. For DN 19, Oradea - Satu Mare sector consulting services for supervision of works execution are supplied.
2007 - ongoing
Romania
Rehabilitation of DN13 Brasov - Sighisoara
The consulting services refer to the rehabilitation of a national road located in a mountain area. The consulting services for supervision of works execution include road rehabilitation for a length of 25.2 km, widening of the carriageway and platforms, rehabilitation works for 11 bridges, 59 culverts, railway level crossing, junctions arrangement, drainage works, culverts and consolidation works in order to prevent sliding.
2000 - 2003
Romania
Rehabilitation works for the port platform in Cernavoda harbour
Design services are provided for the elaboration of technical project, technical specifications and detailed design for the reconstruction of damaged dry-stone pitching, construction of a rubble stone pitching, carrying out a protection under water for the slope foot by a rock fill prism on a faggot mattress, reconstruction of concrete crown beams and providing quay accessories in Cernavoda harbour.
2000 - 2001
Romania
Rehabilitation works for the right bank protection of Sulina channel
Consulting services are provided for the supervision of works execution including defects notification period for rehabilitation works for bank protection on the right bank of Sulina channel between Maliuc - Gorgova sector and Maliuc - Vulturu sector.
2001 - 2004
Romania
Runways repairs and adjacent beaconing for Aurel Vlaicu Airport
The project objective is the elaboration of the detail design and tender documents for the capital repairs of the Delta runway surface reinforcement of the existing roads system of a length of 1240,6 m. The rehabilitation works include the technical documentation for runwaz platform wideing works, rehabilitation of drainage system with longitudinal drains and cross drains for water collecting and leading to the sewerage network. Also, the detail design and tender documents for Delta runway light beaconing are elaborated.
2007 - 2007
Romania
Streets and public lighting system rehabilitation in Sfantul Gheorghe
The project refers to EBRD funded consultancy for rehabilitation of streets of about 34 km and to the modernization of the public lighting system. The streets works include the renewal of the carriageways, building of new central pedestrian areas, construction of new parking areas, modernization of the sidewalks and construction of bicycle lanes. The tender documents (FIDIC - YELLOW BOOK - First Edition 1999 Conditions of Contract for Plant and Design-Build) are prepared, according EBRD Rules.
2009 - ongoing
Romania
Supervision services for streets rehabilitation in Brasov city
The project includes design, supervision and execution of rehabilitation works of the 14 main streets of the Brasov city with a length of about 18.5 km. Supervision of pavement rehabilitation works, protection works and relocation of utility networks (power lines, telecommunications networks, drainage systems, water networks and gas supply networks), lighting street and street furniture are provided. This contract is developed under FIDIC Contract Terms - Yellow Book.
2006 - ongoing
Romania
Supervision services for the construction of two bridges in Guineea
The two bridges are located on Tinkisso river (260m) and on Niger river (490m). The services include the checking "in situ" by tests for the pier foundations, abutments, assistance for precast beams mounting in superstructure and execution of the bridge carriageway.
2002 - 2004
Guinea
Tarnava Mare River Rectification, in the area of Tarna Mare locality
Design services as technical project, technical specifications, tender documentations, detailed design, topographical & geotechnical studies and technical assistance and technical assistance during works execution are provided. The design provides the reduction of the flood risk and of the erosion phenomenon which put at risks the social-economical objectives for the localities nearby and agricultural fields next to the riverbed.
2005 - 2006
Romania
Tarnava Mica River Rectification and Embankment Works on the Cetatea de Balta – Blaj Sector
The project provides the reduction of the flood risk by removing the water destructive actions and execution of protective dikes. Constructive solutions were set in the natural context without a negative impact on environment. The design services are the following: technical project, technical specifications, tender documentations, detailed design, topographical & geotechnical studies and technical assistance and technical assistance during works execution.
2005 - 2006
Romania
Technical consultancy for street infrastructure in Voluntari town
Work supervision for rehabilitation of 50 Main streets in Voluntari town for a total length of about 25 km is provided. Rehabilitation works includes pavement reconstruction / modernization works, sewerage works, water works, utilities protection and relocation works, sidewalks reconstructions, street lightning and urban furniture.
2007 - 2009
Romania
Technological and patrol ways inside Henry Coanda Airport
The project objective is the elaboration of the feasibility study, technical expertise, documentation for approval of intervention works, technical project for xecution of technological and patrol ways inside the Henry Coanda Airport. 3,7 km of road are to be rehabilitated and 3,5 km of new road are designed.
2009 - 2010
Romania
The ecological reconstruction of Ciuperca lake in Tulcea Municipality
Design services are split in two stages: stage I - works for the lake arrangement for touristic purposes for small and medium boats, ecological works (sludge removal, treatment measures for the lake water, landscape arrangements for the miniport). Stage II - works for arrangement of Sf. Gheorghe entrance branch and connection between Danube and Ciuperca lake. Source of financing:UE - Structural Funds.
2007 - 2008
Romania
Touristic miniport in Sf. Gheorghe town
Design services including preparation of feasibility study, technical project and technical specifications, detailed design, documentations for obtaining approvals and authorisations for construction of hydrotechnical works consisting in arrangement of 3 port basins having 100, 150 and 300 m length and 20, 25 respectively of 40 m width, for small and medium boats. The port will be equipped with all necessary utilities.